Resources · Case Studies
Proof in Programs Shipped
Each case study walks through a real engagement - the program, the discipline gap, the engineers we placed, and the outcome. Read the tease, download the full PDF.

10.5 Days: Game Seven Staffing × Leading Fabless Semiconductor
Over 7 years, Game Seven placed 34 IC Layout and Design Verification engineers at a leading fabless semiconductor company in Austin with a 10.5-day median fill time - six times faster than the industry average - and an 82.9% offer acceptance rate. When your tape-out schedule can't wait for a 60-day search, this is what the right staffing partner delivers.

A Decade of Trust: Game 7 Staffing and Northrop Grumman
Over 11 years, Game 7 has placed 49 engineers at Northrop Grumman. The partnership began in September 2014, and those placements span 16 distinct engineering role types. It's the longest client relationship in our portfolio.
Scaling Through Acquisition: How Game Seven Powered a Leading Coherent Optics Company From Startup to Fortune 500
Over 8 years and through a $4.5B acquisition, Game 7 Staffing placed 41 Physical Design, Verification, STA, and DFT engineers at a leading coherent optics company with a 22-day average fill time and a 37.6% interview-to-hire rate. When the work is too specialized for a generalist firm and the schedule can't slip, that's exactly the problem we were built for.
