Skip to main content
All posts

US Person vs Cleared: What Program Owners Confuse Before a Q1 Defense Start

By Game 7 Staff2 min read
Empty dark ID plaque beside a vertical badge on a black lanyard, the badge’s lower half glowing orange on a matte black surface.

Export-control access, personnel security, and assurance certification are different staffing gates. Name the one your seat actually carries.

Before a Q1 defense or aerospace start, the req language often looks precise until you read it twice. US person. ITAR. Cleared. Clearable. DO-254. DO-178C.

Those words are not synonyms, and your Q1 start depends on naming the right one. We staff to these gates on aerospace and defense programs. We do not set the gates. The definitions below are the staffing-relevant plain-language version of rules the regulator and the standards bodies own, and we will not name confidential programs while we walk them.

US Person Is an Access Category

In the export-control sense used on many defense programs, US person is a defined category under the ITAR framework in 22 CFR 120 to 130. It is about who may access certain defense articles and technical data under the export-control rules.

It is not a clearance. It is not a certification. If your seat needs a US person and another seat needs an active Secret clearance, those are different staffing problems for you, even when the resumes look similar.

Cleared and Clearable Are Personnel-Security States

Active clearance means the person currently holds eligibility for access at a stated level (for example Secret, Top Secret, or SCI), under the personnel-security process administered through DCSA and adjudicated against the National Security Adjudicative Guidelines in SEAD 4 from ODNI.

Clearable usually means the person does not currently hold the needed eligibility, but the program is willing to sponsor investigation and adjudication. Sponsorship takes calendar time. A Q1 start that assumes an already-active clearance… cannot treat "clearable" as a synonym you paste into the start-date cell.

We have walked the contract cleared-hiring side before in hiring cleared engineers on contract and the export-control staffing side in ITAR contract engineering staffing. Use those for process depth. Use this post when the req itself is mixing the categories.

Certification Is Not Clearance

DO-254 is hardware assurance guidance for airborne electronic hardware. DO-178C is software assurance guidance for airborne systems. FAA acceptance context lives in advisory circulars such as AC 20-152A for complex hardware and AC 20-115D for software. DAL language describes assurance level, not whether someone can enter a classified facility.

Program owners get frustrated when a resume with DO-254 FPGA work is treated as interchangeable with a cleared systems seat, or when a cleared embedded engineer is assumed to already think in DAL terms. Certification experience and clearance eligibility solve different gates.

What to Put in the Req Before Q1

Name the gate your seat actually needs:

·       US person / ITAR access for the technical data involved

·       Active clearance at a stated level, or willingness to sponsor (with calendar honesty)

·       DO-254 / DO-178C / DAL experience if the assurance process is the work

Then staff the engineering layer beside it on your roadmap: FPGA under process rigor, embedded under DAL expectations, board under mil-aero constraints. Mixing those into one vague "defense engineer" title is how your January starts miss the gate they were opened to satisfy.

If you can already name which gate the Q1 seat carries, tell us which gate the Q1 seat actually carries and we will staff to that language.

FAQ

Frequently Asked Questions

Is US Person the Same Thing as Cleared?

No. US person is an export-control access category under ITAR definitions. Cleared is a personnel-security eligibility state. A seat can require one, the other, both, or neither.

Does DO-254 or DO-178C Experience Substitute for a Clearance?

No. Assurance certification experience and clearance eligibility are different gates. Write both explicitly when both are required.

Written by

Game 7 Staff